| Work Method Statement: |
|
|
Telecommunication
Towers |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Activity |
What are the Hazards? |
What is the Risk? |
How are you going to Control the Hazard and minimise the risk of injury? |
Who is going to Monitor and |
| |
(What has the potential to
cause injury?) |
(From Risk Calculator - see below) |
A HAZARD MAY REQUIRE THE USE OF ONE OR MORE
CONTROL MEASURES - CROSS OUT/ DELETE CONTROL MEASURES NOT USED |
Review
it and How? |
| |
|
|
1. Only Trained
Staff to work on Telecommunication Towers.
Eg. Aware of safe |
Name |
| Working
on |
Fall from Height |
|
climbing methods like maintaining 3 points of contact at
all times. |
|
| Telecom- |
|
|
|
|
|
|
|
|
|
|
| munication |
|
|
2. "Riding the
Line" practice only to be performed within the allowable heights of |
|
| Towers |
|
|
the
Industry Standard. Recommend climbing
with fall protection or use of |
|
| |
|
|
personnel platforms. |
|
|
|
|
|
|
| |
|
|
|
|
| |
|
|
3. Hoisting
Equipment to be approved, certified and inspected by a competent |
Signature |
| |
|
|
person. Equipment
should be used and maintained in line with its specifications. |
|
| |
|
|
|
|
|
|
|
|
|
|
| |
|
|
4. Gin Poles to be
designed by an Engineer. The Engineers
drawings should |
|
| |
|
|
be available on site and should detail the devices
attachments and limitations. |
|
| |
|
|
|
|
|
|
|
|
|
|
| |
|
|
5. Use appropriate
PPE and safety equipment; ensure it is
in good working order |
|
| |
|
|
and maintained and
used as per the manufacturers instructions. |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
| |
|
|
6. Ensure the
communication between the worker and hoist operator is Clear |
Method (How) |
| |
|
|
and Operational at all
times. |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
inspection |
| |
|
|
|
7. Two or more
workers must be present at all times work is in progress. If the |
where required |
| |
|
|
|
Fall Arrest System is activated for one worker, the other/s
can initiate rescue |
|
| |
|
|
|
arrangements. |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
supervised |
| |
|
|
|
8. Workers to
inspect their equipment is free from obvious defect before each use. |
|
| |
|
|
|
Pay particular
attention to the condition of anchorage devices. |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
competent |
| |
|
|
9. Check
Environmental Conditions are safe for proposed Telecommunication |
persons where |
| |
|
|
Tower
activities. ie: Low wind activity etc. |
|
|
|
required |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| HOW TO USE
THIS RISK TABLE |
|
RISK
RATING CALCULATOR |
Likelihood |
|
Risk Rating |
Prioritisation |
| |
|
|
Consequence |
Very likely Could happen anytime |
Likely Could happen sometimes |
Unlikely Could happen, but only rarely |
Very Unlikely Could happen, but probably never
will |
|
1 or 2 |
Action to rectify |
| Step 1: Identify potential hazards. |
|
What injury/damage could it cause? |
|
|
must be done |
| Step 2: Decide what the possible Consequence could
be |
|
Death or permanent disability |
1 |
1 |
2 |
3 |
|
|
immediately |
| Step 3: Decide How Likely? It is to happen |
|
Long term illness or serious injury |
1 |
2 |
3 |
4 |
|
3, 4 or 5 |
Consider |
| Step 4: Line up your choices in the table to get a
number |
|
Medical attention & several days off work |
2 |
3 |
4 |
5 |
|
|
control measure |
| Step 5: Use the Priority table (far right side) to
guide your next steps |
|
First aid needed |
3 |
4 |
5 |
6 |
|
|
as necessary |
|
|
|
|
|
|
|
|
|
|
|
|