Work Method Statement: Telecommunication Towers
Activity What are the Hazards? What is the Risk? How are you going to Control the Hazard and minimise the risk of injury? Who is going to Monitor and 
  (What has the potential to cause injury?) (From Risk Calculator - see below) A HAZARD MAY REQUIRE THE USE OF ONE OR MORE CONTROL MEASURES - CROSS OUT/ DELETE CONTROL MEASURES NOT USED Review it and How?
 
     Uncontrolled
  1.  Only Trained Staff to work on Telecommunication Towers.  Eg.  Aware of safe Name
Working on  Fall from Height   climbing methods like maintaining 3 points of contact at all times.  
Telecom-      
munication     2.  "Riding the Line" practice only to be performed within the allowable heights of  
Towers     the Industry Standard.  Recommend climbing with fall protection or use of   
      personnel platforms.  
         
      3.  Hoisting Equipment to be approved, certified and inspected by a competent Signature
      person.  Equipment should be used and maintained in line with its specifications.  
       
      4.  Gin Poles to be designed by an Engineer.  The Engineers drawings should  
      be available on site and should detail the devices attachments and limitations.  
         
      5.  Use appropriate PPE and safety equipment;  ensure it is in good working order  
      and maintained and used as per the manufacturers instructions.  
       
      6.  Ensure the communication between the worker and hoist operator is Clear Method (How)
      and Operational at all times.
   Visual 
      inspection
      7.  Two or more workers must be present at all times work is in progress.  If the where required
      Fall Arrest System is activated for one worker, the other/s can initiate rescue  
      arrangements.  
   Workers 
      supervised
      8.  Workers to inspect their equipment is free from obvious defect before each use.  
      Pay particular attention to the condition of anchorage devices.  
   Use of 
        competent
      9.  Check Environmental Conditions are safe for proposed Telecommunication persons where
      Tower activities.  ie:  Low wind activity etc.   required
         
HOW TO USE THIS RISK TABLE RISK RATING CALCULATOR Likelihood Risk Rating Prioritisation
    Consequence Very likely Could happen anytime Likely Could happen sometimes Unlikely Could happen, but only rarely Very Unlikely Could happen, but probably never will 1 or 2 Action to rectify
Step 1:  Identify potential hazards. What injury/damage could it cause?   must be done
Step 2:  Decide what the possible Consequence could be Death or permanent disability 1 1 2 3   immediately
Step 3:  Decide How Likely? It is to happen Long term illness or serious injury 1 2 3 4 3, 4 or 5 Consider
Step 4:  Line up your choices in the table to get a number Medical attention & several days off work 2 3 4 5   control measure
Step 5:  Use the Priority table (far right side) to guide your next steps First aid needed 3 4 5 6   as necessary